Paper details
500-700 words
Develop a five hazard Inventory associated with an organizational system of your choice. Assess the risk
and develop mitigations that will lower the risk to a level as low as reasonably practicable (ALARP). With
the mitigations in mind develop a risk assessment tool to assure that as an operation evolves, personnel
are assessing safety as change occurs. Examples of change include but are not limited to: weather,
fatigue, delays, equipment failures, personnel changes, illness, etc.
If we break the assignment down it looks kind of like this;
a. hazard Inventory (5 items) 25 points
b. risk assessment (Hi, Med, Low) 25 points
c. mitigations that lower risks to ALARP 50 points
d. risk assessment tool to assess changes in your 5 risk levels 100 points
TOTAL = 200 points